Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Chapters:

1. Installing the Genius Hub

2. Installing the boiler Receiver Units

3. Installing the Thermostats

4. Installing the wet underfloor Receiver Units

5. Installing the Electric Switches

6. Installing the Smart Plugs

7. Installing the Radiator Valves

8. Installing the Room Sensors

9. Logging onto the Genius Hub

10. Testing the heating

11. Completing the installation

12. Legal Information & Datasheet 

ERROR

The requested URL could not be retrieved


The following error was encountered while trying to retrieve the URL: https://confluence.geniushub.co.uk/*

Connection to 94.173.17.80 failed.

The system returned: (110) Connection timed out

The remote host or network may be down. Please try the request again.

Your cache administrator is webmaster.



Generated Mon, 25 Nov 2024 22:17:15 GMT by ip-10-19-3-13 (squid)

  • No labels